The city of Dhaka faces the challenge of ensuring a sustainable drinking water supply. Until now, the water supply has come mainly from groundwater, but falling water levels and limited extraction capacity mean that a new solution is needed. The “Dhaka Environmentally Sustainable Water Supply Project” involves the construction of a modern drinking water treatment plant in Gandharbpur in the northeast of Dhaka, complete with a river water intake, two pumping stations, and raw and drinking water transmission pipelines. The project is partly being implemented under a DBO (design, build, operate) model. Fichtner provided construction supervision for three construction contracts, review of the contractor’s design, commissioning supervision for the facilities, and claim management for the FIDIC contracts.
Project Factsheet
m³/day river water intake and grit chamber
Pipelines (DN 400-DN 2,200) for raw water and drinking water
m³/day drinking water treatment plant and water transmission
Key Facts
Client
Dhaka Water Supply and Sewerage Authority
Dhaka
Bangladesh