Water Supply for Dhaka: Expansion Project

Bangladesh

Project Factsheet

The city of Dhaka faces the challenge of ensuring a sustainable drinking water supply. Until now, the water supply has come mainly from groundwater, but falling water levels and limited extraction capacity mean that a new solution is needed. The “Dhaka Environmentally Sustainable Water Supply Project” involves the construction of a modern drinking water treatment plant in Gandharbpur in the northeast of Dhaka, complete with a river water intake, two pumping stations, and raw and drinking water transmission pipelines. The project is partly being implemented under a DBO (design, build, operate) model. Fichtner provided construction supervision for three construction contracts, review of the contractor’s design, commissioning supervision for the facilities, and claim management for the FIDIC contracts.

m³/day river water intake and grit chamber
Pipelines (DN 400-DN 2,200) for raw water and drinking water
m³/day drinking water treatment plant and water transmission
Key Facts

Modernization of the Water Supply System in Dhaka

  • Geotechnical calculations and designs
  • Ecological assessment and monitoring of construction
  • Monitoring of environmental, social, health, and safety (ESHS) requirements
  • On-site construction supervision
  • Final acceptance and commissioning
  • Claim management
  • Contract management training
  • River water intake and grit chamber: 1,050,000 m³/day
  • Raw water pumping station: 525,000 m³/day
  • Raw water transmission pipeline: 22 km, 2 x DN 1,600
  • Drinking water treatment plant: 500,000 m³/day
  • Transmission pipelines for treated water: 14 km, DN 2,200
  • Distribution pipelines: 24 km, DN 800-1,600
  • Additional distribution pipelines: 43 km, DN 400-800

Client

Dhaka Water Supply and Sewerage Authority

Dhaka
Bangladesh