Skip to main contentSkip to page footer

Technical Advisory Services for the Expansion of Renewable Energies

Saudi Arabia

Project Factsheet

The Kingdom of Saudi Arabia has adopted a program called “Saudi Vision 2030” with the aim of diversifying the Saudi economy. Under this plan, renewable energies are to be expanded to 58.7 GW by 2030 as part of the “National Renewable Energy Program (NREP)”. The main focus of this is on tendering IPP projects with long-term power purchase agreements (PPAs). Fichtner has been contracted as Technical Advisor to assist with the development and tendering of wind, solar PV, and battery storage projects. 

Since 2017, Fichtner has been carrying out these tasks for the Saudi Power Procurement Company. The first solar PV and wind projects in the country were successfully put out to tender and have since been put into operation. All in all, Fichtner is assisting with over 20 GW of wind and solar PV power plant capacity, spread across 30 individual projects so far. As part of the project, the world’s lowest levelized cost of electricity (LCOE) for solar PV (1.04 cUSD/kWh) and wind power (1.34 cUSD/kWh) was achieved in IPP tenders.

Wind and solar PV power plant capacity in implementation
Levelized cost of electricity for solar PV
Levelized cost of electricity for wind power
Key Facts

Consulting Services Throughout the Entire Tendering and Development Process

  • Due diligence 
  • Drafting the tender documents 
  • Tendering 
  • Bid evaluation 
  • Contract negotiations 
  • Support up to financial close 
  • Training workshops 
  • Support in the development of guidelines
  • World-record levelized cost of electricity for wind power (1.34 cUSD/kWh) and solar PV (1.04 cUSD/kWh) 
  • Saudi Arabia’s first utility-scale solar PV project: Sakaka, 300 MW (in operation) 
  • Saudi Arabia’s first utility-scale wind power project: Dumat Al Jandal, 400 MW (in operation) 
  • 14.1 GW of solar PV power plants (25 individual projects, of which approximately 2 GW in operation, 9 GW under construction, and 3 GW in tendering) 
  • 13.2 GW of wind power plants (13 individual projects, of which approximately 0.4 GW in operation, 6.3 GW under construction, and 6.5 GW in tendering)

Client

Saudi Power Procurement Company (SPPC)

Riyadh
Saudi Arabia