The Jamuna is one of Bangladesh’s largest and most dynamic rivers, posing significant challenges to the surrounding communities due to severe erosion and recurring floods. The goal of the river bank and flood protection program was to ensure long-term safety for the population and continued functionality of critical infrastructure along the right bank in the Bogra District. Our core tasks included the development and planning of viable technical solutions for river bank protection measures as well as for associated hydraulic structures such as fish passes and weir systems. In doing so, environmental and social requirements were incorporated, and the necessary resettlement processes were prepared as part of a Social Management Plan and a Resettlement Action Plan. We also prepared the tender documents for the various measures as well as a concept for sustainable operation and maintenance.

Total river section
Capital expenditure
Design flow
Key Facts

Sustainable Protection of the Jamuna River Bank in Bogra District

  • Feasibility study
  • Basic and detailed design
  • Preparation of tender documents and assistance in contract award
  • Baseline assessment
  • Economic/financial study
  • Socio-economic study
  • Topographic survey (during design/construction)
  • Ground investigation
  • Sampling and analysis
  • Geotechnical calculations
  • Hydrological and morphological investigations
  • Environmental impact assessment
  • Simla - Shaharabari river section: 26 km
  • Shaharabari - Hasanpara river section: 24 km
  • River bank protection measures: 38 km
  • Embankments and roads: 50 km
  • Hydraulic structures: Fish passes, culverts, weirs
  • Design flow: 110,000 m³/s
  • Flow rate: 4.5 m/s
  • Capital expenditure: approximately USD 650m

Client

Bangladesh Water Development Board (BWDB)

Dhaka