An energy sector company built a new data center, including a control room. The project meets the highest safety standards and is geared towards obtaining TÜV-IT Level 4 certification, which ensures a very high level of protection. To ensure operational reliability, the building is designed with spatial redundancies that allow for separate, redundant systems. The technical equipment includes, among others, water and wastewater systems, heating and cooling systems, ventilation systems, gas fire suppression systems, and electrical and communications infrastructure. All systems are designed for maximum availability and redundancy. Fichtner handled all of the planning for the technical building services of this extremely safe data center.

Key Facts

Technical Building Services for a Data Center Meeting the Highest Standards

  • Planning of the technical building services  
  • Baseline assessment, conceptual engineering, basic engineering, permit engineering, detailed engineering, preparation of tender documents, assistance in contract award, construction supervision, and follow-up during the warranty period 
  • Development of redundant supply systems 
  • Integration of heating and cooling systems 
  • Design of ventilation systems 
  • Planning of gas fire suppression systems 
  • Planning of power supply and emergency standby power systems 
  • Planning of communications and IT Infrastructure 
  • Fire suppression system: Nitrogen (N₂) 
  • Heat supply: Heat pump with three sources 
  • Cooling supply: Fully redundant ring circuit system 
  • 250 racks with an IT capacity of 1.5 MW