The Otjikoto biomass power plant that is being built in northern Namibia is a pioneering energy project that addresses two key challenges: sustainable electricity generation and the mitigation of increasing scrub encroachment in savanna landscapes. The power plant, which features a grate-fired boiler and has a planned capacity of 40 MWe, is to be fueled by wood chips from encroacher bush harvested from an area extending beyond a 100 km radius. This approach creates a regionally based energy source that helps both stabilize the electricity supply and restore valuable ecosystems. The project implementation involves technical, environmental, and logistical challenges – from fuel supply to the construction of the plant by an EPC contractor. For this challenging project, Fichtner provided technical advisory and owner’s engineering services as well as technical support throughout all project phases.
Project Factsheet
Net capacity of the biomass power plant
Planned availability
Key Facts
Client
Namibia Power Corporation (PTY.) Ltd.
Windhoek
Namibia