Next Energy Capital (NEC) manages a large portfolio of utility-scale solar PV assets across the UK, with projects spanning development, construction and operational phases. Over the past five years, Fichtner has supported more than 70 solar PV projects under a framework agreement, including major schemes such as the Camden Portfolio (100 MWp), Llanwern Solar Park (75 MWp), Strensham Solar Park (40 MWp), and Whitecross Solar Park (36 MWp).
Fichtner was appointed by NEC and WiseEnergy to provide Technical Advisory and Owner’s Engineer services across the portfolio. Engagements are typically project-specific, supporting delivery over 6–12-month periods, with a focus on maintaining technical quality, programme control, and risk management across multiple concurrent developments.
The technical scope spans preconstruction and construction phases, including energy yield assessments, detailed review of key components such as modules, inverters, mounting systems, transformers, and cable infrastructure, and assessment of EPC contractor design and deliverables. Fichtner also undertakes construction quality monitoring, commissioning review, and performance testing, alongside participation in factory and site acceptance testing.
Additional scope includes contract administration, interface and grid connection management, health and safety oversight, and review of commercial and technical documentation, including EPC contracts, O&M agreements, financial model assumptions, and grid connection arrangements.
Deliverables include technical due diligence reports, design and construction reviews, performance certification, and cost and programme commentary.