Modernization Projects of Hidroeléctrica de Cahora Bassa

Mozambique

Project Factsheet

The operator of the Cahora Bassa hydropower plant in Mozambique is planning to carry out two major modernization measures: replacing the generator units in the power plant and comprehensively modernizing the Songo HVDC converter station, via which most of the generated energy is exported to South Africa over a distance of 1,420 km. These measures are technically demanding and involve unavoidable plant downtime. However, by cleverly interlinking the project processes, downtime can be significantly reduced and economic losses minimized. The complex interfaces of both projects – including parallel execution phases and the coordination of critical systems such as the legacy thyristor technology – require a high level of technical expertise and precise coordination. Fichtner is handling the coordination of interfaces, assisting with tenders, and supporting the operator in reducing risks and ensuring an optimal sequence of all measures.

HVDC converter station
Transmission voltage
Length of HVDC line
Key Facts

Services for Modernization of Hydropower Plant and HVDC Station

  • Interface coordination for both modernization projects
  • Planning of optimal workflow strategies
  • Minimization of project-related downtime
  • Risk assessment and action planning
  • Support for the Songo tender 
  • Assistance with HVDC supplier selection
  • Technical consulting on HVDC systems
  • Management of project communication
  • Support in the procurement process for an owner’s engineer 
  • +2,000 MW total capacity of Cahora Bassa power plant
  • 1920 MW HVDC converter station at the Songo site
  • 533 kV HVDC transmission voltage
  • 1,420 km HVDC line to South Africa 