The project involved a comprehensive modernization of the central control and monitoring system for secondary and tertiary control in the Austrian transmission grid. The goal was to introduce a system capable of meeting the growing demands of power frequency control, particularly in light of fluctuating load flows, increasing feed-in from renewable energies, and the growing cross-border exchange of balancing energy within the ENTSO-E network. The new system was to offer enhanced functionality and greater flexibility while also enabling robust emergency restoration through a multi-redundant architecture, high availability, and a backup system. This makes a significant contribution to the stability of the European interconnected grid. Fichtner developed the technical specifications and tender documents for this project, supported the client throughout all phases of the procurement process, and also assisted the client during the implementation phase.