The operator of Jordan’s national high-voltage transmission grid, the National Electric Power Company (NEPCO), developed a comprehensive master plan for the period 2023–2035 to proactively plan for future electricity generation and transmission grid requirements. The goal was to meet Jordan’s growing energy needs efficiently, sustainably, and in line with the national energy strategy. The planning was guided by a clear vision based on scientific principles and designed to ensure fair electricity costs. This is intended to boost the efficiency of the electricity sector and support the country’s sustainable development. Key tasks included analyzing regulatory requirements, preparing a reliable electricity demand forecast, and developing strategies for grid expansion and the integration of new technologies. Fichtner conducted comprehensive power system studies, modeled demand trends, and, based on this, developed a comprehensive master plan for generation and transmission.

Years in the forecast horizon
Key Facts

Master Plan for Sustainable Electricity Supply in Jordan

  • Preparation of the electricity demand forecast 
  • Expansion planning for electricity generation
  • Development of the transmission grid expansion plan 
  • Power system modeling
  • Review of regulatory documents 
  • Preparation of the master plan report 
  • Forecast horizon: 12 years
  • Energy market simulation and optimization software: PLEXOS 