Skip to main contentSkip to page footer

Lai Chau 1200 MW Hydropower Plant

Vietnam

Project Factsheet

This hydropower project on the Song Da River in Lai Chau Province is located in northern Vietnam on the border with China. The aim was to increase the national electricity generation capacity and improve the water supply for irrigation during the dry season. The main tasks were to construct a 137-meter-high dam made of roller-compacted concrete (RCC) and a power plant with three Francis turbines, as well as to connect the plant to the national power grid via a 500 kV GIS substation. Special features of the project include the enormous size of the structure, the complex construction processes, and the special diversion structures for the river. Fichtner handled the design review, construction supervision, project management support, and commissioning supervision. 

Installed capacity
Dam height
Crest length
Head
Key Facts

Expertise for Complex Hydropower Projects

  • Assisting in project management and providing expertise in all technical disciplines 
  • Design review for all civil and electromechanical works 
  • Supervision of construction and commissioning, with interface coordination
  • Total capacity: 1,200 MW
  • Dam: 137-m-high roller-compacted concrete (RCC) gravity dam with a crest length of 612 m 
  • Head: 95 m 
  • Design discharge: 1,617 m³/s 
  • Powerhouse with three 400 MW Francis turbines

Client

Son La Hydropower Management Board (SLaMB)

Hanoi
Vietnam