This hydropower project on the Song Da River in Lai Chau Province is located in northern Vietnam on the border with China. The aim was to increase the national electricity generation capacity and improve the water supply for irrigation during the dry season. The main tasks were to construct a 137-meter-high dam made of roller-compacted concrete (RCC) and a power plant with three Francis turbines, as well as to connect the plant to the national power grid via a 500 kV GIS substation. Special features of the project include the enormous size of the structure, the complex construction processes, and the special diversion structures for the river. Fichtner handled the design review, construction supervision, project management support, and commissioning supervision.