To ensure long-term water routing in the historic “Zwiesler-Tiefer-Erbstolln” drainage tunnel, the Saxon Mining Authority contracted Fichtner to plan and provide technical support for comprehensive tunnel rehabilitation. Constructed in 1825, this approximately 1,400-meter-long tunnel is located in Berggießhübel near Dresden and is one of the most important water drainage tunnels in the former iron ore mining region there.
As part of the rehabilitation, mining-related risks were eliminated and proper water drainage was permanently restored. The works included, among other things, desludging and removal of sediment on the tunnel floor as well as securing areas at risk of structural instability. Adjacent mine workings and three shafts were also explored and secured: Two shafts were fitted with a sturdy reinforced concrete cover, while the third shaft was rebuilt down to a depth of 35 meters and converted into an emergency exit along its entire length.
To ensure permanent drainage, the hydraulic connections between the drainage tunnel and the adjacent mine workings were inspected and optimized. The general accessibility of the tunnel was also restored, with the rehabilitation works establishing lasting stable hydraulic and geotechnical conditions.
Fichtner handled all engineering services – from preliminary and detailed engineering through to construction supervision and documentation. Upon completion of the rehabilitation, all project objectives were achieved.