The client is developing the power supply of the mine which will take the form of a hybrid power plant comprising a solar PV plant, battery energy storage system (BESS), energy management system (EMS), and thermal power plant. The goal of the project is to design and implement the hybrid plant to achieve the lowest cost of energy while ensuring reliable energy supply for the mine. Fichtner provides technical advisory services as owner’s engineer for the replacement of diesel generators with a hybrid solar/battery system.
Project Factsheet
PV capacity
Energy storage capacity
Thermal power plant capacity
Key Facts
