Alleging that changes to Spain’s government subsidy conditions had unfairly disadvantaged him, the owner of a solar power plant initiated arbitration proceedings against the Spanish government. The goal of the project was to provide a well-founded analysis of the economic impact of the revised subsidy mechanisms and to support the client’s technical and economic arguments. To this end, detailed studies were conducted on the construction costs for Spanish solar plants and the costs of a legally defined reference power plant. An international comparison of Spain’s market design for remunerating solar power plants was also conducted. Experts from Fichtner’s Spanish subsidiary also conducted on-site research into important details of the local legislative procedure. The expert opinions served as a key basis for the client in the arbitration proceedings.