As part of civil litigation surrounding the construction of a new power plant, an investigation was conducted to determine whether the delayed commissioning had resulted in economic losses and, if so, what the amount of those losses would be. The focus was on the technical and economic assessment of various methods of determining alleged losses that were cited by the opposing party at different times. In addition, a separate, independent estimate of the losses was provided for use in both settlement negotiations and court proceedings. Finally, Fichtner prepared the expert opinions required for a well-founded assessment of the issues concerning losses.