Located in the heart of Kenya’s Rift Valley is the Olkaria geothermal field, a hotspot for sustainable energy production. The existing Olkaria I power plant situated there was expanded to include an additional unit in order to efficiently utilize the proven steam power from reservoirs up to 3,000 meters deep. With a capacity of 83.3 MW, the new unit plays a key role in increasing Kenya’s geothermal power generation capacity to 944 MW and making the country one of the world’s largest geothermal power producers. The project was implemented in two lots: the steam field ensures the processing and delivery of steam as well as the reinjection of brine, while the power plant converts the steam into electrical energy and feeds that energy into the grid. A particular challenge was integrating the unit into the existing infrastructure and coordinating two EPC contracts. Fichtner handled the conceptual and tender design, provided support with procurement, and supervised construction through to commissioning.
Project Factsheet
Capacity
Switchgear
Key Facts
Client
KenGen - Kenya Electricity Generating Company Ltd.
Nairobi
Kenya