Design Review for the Power Connection of a Data Center

Germany

Project Factsheet

The project involves the development of a data center with a total requirement of over 40 MW IT capacity. The power is provided in stages by the local utility. In the first phase, a temporary connection is planned, which includes a new substation and cable connections from the utility company’s transmission tower. This is later followed by a permanent connection with a capacity of over 50 MW. The goal of the project is to ensure that the design and the selected equipment fully comply with the utility company’s requirements. Particular attention is paid to the identification of nonconformities, technical risks, and compliance with all relevant standards. To this end, Fichtner conducted a comprehensive design review, assessed critical issues, and developed specific recommendations. The results were summarized in a detailed final report, which serves as the basis for successful implementation of the project.

Total IT capacity requirement
Permanent connection
Key Facts

Review of Design Package for Data Center Connection

  • Peer review of the design package 
  • Review of equipment specifications 
  • Verification of compliance with local standards and requirements 
  • Review of the grid connection plan for a temporary connection 
  • Analysis of specifications for substation and cable systems 
  • Identification of nonconformities and technical risks 
  • Recommendations for adaptations and translations 
  • Total power requirement of IT equipment: >40 MW
  • Permanent connection: >50 MW
  • Power supply in two stages
  • New substation for temporary connection
  • Cable connections from the utility company’s transmission tower