The project involves the development of a data center with a total requirement of over 40 MW IT capacity. The power is provided in stages by the local utility. In the first phase, a temporary connection is planned, which includes a new substation and cable connections from the utility company’s transmission tower. This is later followed by a permanent connection with a capacity of over 50 MW. The goal of the project is to ensure that the design and the selected equipment fully comply with the utility company’s requirements. Particular attention is paid to the identification of nonconformities, technical risks, and compliance with all relevant standards. To this end, Fichtner conducted a comprehensive design review, assessed critical issues, and developed specific recommendations. The results were summarized in a detailed final report, which serves as the basis for successful implementation of the project.
Project Factsheet
Total IT capacity requirement
Permanent connection
Key Facts