Broxburn & Cathkin BESS

Scotland

Project Factsheet

The ENGIE BESS portfolio in Scotland comprises two utility-scale battery energy storage system developments at Broxburn, west of Edinburgh, and Cathkin, near Glasgow. Each site provides 50 MW / 100 MWh of storage, delivering a combined 100 MW / 200 MWh capacity to support grid stability and renewable integration. Both projects are connected to the SP Energy Networks 33 kV distribution system and are designed to operate alongside ENGIE’s wider portfolio of flexible generation assets.
Fichtner was appointed as Owner’s Engineer to provide independent technical oversight across both projects during design, procurement, and construction. The role focused on maintaining technical quality, assessing delivery risks, and supporting project execution through structured technical review and assurance.
The core technical scope included review of BESS system design and architecture, including battery containers, inverters, and control systems based on e-STORAGE SolBank technology. Fichtner assessed contractor design deliverables, equipment specifications, and performance parameters, alongside reviewing inspection and test plans and construction methodologies. Ongoing construction monitoring and commissioning readiness support were also provided, including FAT and SAT witnessing.
Additional scope included grid connection review and coordination with the 33 kV distribution network, interface management across civil and electrical works, and assessment of programme, risk, and contractual arrangements. Fichtner also supported contract administration and technical input to project governance.
Deliverables included technical review reports, site inspection records, commissioning assessments, and cost and programme commentary.
 

MW / MWh BESS total capacity
Grid connection
Key Facts

Supporting battery storage projects

  • Owner’s Engineer services (multi-site BESS)
  • BESS design and system architecture review
  • Contractor deliverable and specification assessment
  • Construction monitoring and quality assurance
  • Grid connection and interface coordination
  • Testing and commissioning oversight (FAT/SAT)
  • Programme, risk, and contract administration
  • 2 × 50 MW / 100 MWh BESS sites (100 MW / 200 MWh total)
  • Connected to SP Energy Networks 33 kV distribution system
  • Two-hour duration systems using SolBank containerised technology