The Badische Rheinschiene Grid Reinforcement (NBR) project is a key infrastructure project aimed at ensuring a reliable power supply in southwestern Germany. The aim is to replace the existing 220 kV overhead line between Karlsruhe-Daxlanden and Eichstetten am Kaiserstuhl with a modern 380 kV line in order to significantly increase transmission capacity and meet the requirements of the energy transition. The new line will be constructed over a distance of around 120 kilometers with an optimized number of transmission towers, reducing the impact on nature and agriculture. In addition to the power line, the project includes the modification of five substations along the route, with two sites to be expanded and three to be built from scratch. Another substation is also being built in Kehl-Kork to improve grid stability. Implementation requires precise planning, coordination, and consideration of environmental aspects. Fichtner is supporting the project from start to finish and assisting TransnetBW with project control and planning services for the line construction component. In addition, we are performing the on-site construction supervision and environmental monitoring of construction.
Photo: TransnetBW GmbH