Badische Rheinschiene Grid Reinforcement (NBR) Project

Germany

Project Factsheet

The Badische Rheinschiene Grid Reinforcement (NBR) project is a key infrastructure project aimed at ensuring a reliable power supply in southwestern Germany. The aim is to replace the existing 220 kV overhead line between Karlsruhe-Daxlanden and Eichstetten am Kaiserstuhl with a modern 380 kV line in order to significantly increase transmission capacity and meet the requirements of the energy transition. The new line will be constructed over a distance of around 120 kilometers with an optimized number of transmission towers, reducing the impact on nature and agriculture. In addition to the power line, the project includes the modification of five substations along the route, with two sites to be expanded and three to be built from scratch. Another substation is also being built in Kehl-Kork to improve grid stability. Implementation requires precise planning, coordination, and consideration of environmental aspects. Fichtner is supporting the project from start to finish and assisting TransnetBW with project control and planning services for the line construction component. In addition, we are performing the on-site construction supervision and environmental monitoring of construction.

Photo: TransnetBW GmbH

Line length
Line upgrade
Key Facts

Project Support from Start to Finish – as Line Construction System Integrator


Planning Services

  • Conceptual and Detailed Design
  • Preparation for and Assistance with the Bidding Process
  • Supervision of Construction, Site Supervision
  • Consulting and Monitoring of Construction Work for Soil Protection

Project management

  • Document and schedule management
  • Procurement and contract management
  • Schedule, cost, and risk management
  • Progress tracking, minutes, and reporting
  • Change, quality, and space management
  • Health, safety, and environmental management
  • Environmental construction supervision 
  • Replacement of 220 kV line with new-build 380 kV line 
  • Power line: 120 km double-circuit line in four sections  
  • 12 preparatory measures prior to line construction 
  • Six substations in the project area 

Client

TransnetBW GmbH