Namibia is expanding its own renewable energy production by hundreds of megawatts in photovoltaics and wind power. This rapid expansion poses a challenge for the Namibian electricity sector. In light of this situation, KfW offered to finance a Battery Energy Storage System (BESS) project to support the power grid. In this context, we conducted a detailed feasibility study to identify the optimal location, technology, configuration and use cases for the BESS. After successful approval of the business plan, the Omburu site was selected. As Owner's Engineer, we undertook the procurement of an international EPC through a tender process. Our support to NamPower will continue during the implementation process to ensure a safe and efficient BESS project. During operation, the project will be monitored through our online platform FES to control contractual obligations and provide recommendations for dispatching improvements to maximize benefits.

 

Maximum electrical power
Electrical storage capacity
Key Facts

Successful Battery Storage Solutions –
Fichtner’s Role in the BESS Project

  • Feasibility and Grid Study 
  • Financial and Economic Assessment 
  • ESIA Scoping report 
  • Preparation of bidding and contractual documents 
  • Bid evaluation and contract negotiations 
  • Detailed Design review
  • Construction Supervision 
  • Operation Monitoring and Optimization through Fichtner Engineering Suite
  • Rated power: 54 MW  
  • Energy storage capacity: 54 MWh 

Client

NamPower Center

Windhoek
Namibia